Chinchilla Solar Farm Stormwater Assessment | WMS Engineering
Hartwigs Road, Burncluith QLD, Australia

Chinchilla Solar Farm Stormwater Assessment

Questions? Get in touch today.

Client

juwi Renewable Energy

Scope

Impact

Questions? Get in touch today.

Client

juwi Renewable Energy

Scope

Impact

Related Projects

Aurecon

Brisbane Airport Drainage Assessment

City of Gold Coast

Loders Creek Hydraulic Model Peer Review

Toowoomba Regional Council

Condamine River Flood Study

Tenterfield
Tenterfield Shire Council

Tenterfield Dam Bathymetric Survey

WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
AFPS Graph for Macquarie Marshes
Australian Fish Passage Services

Inland NSW Fish Passage

Australian Fish Passage Services commissioned WMS to quantify the hydraulic impacts to water volumes at a proposed fish passage in inland NSW
Pallamallawa and community involvement
Moree Plains Shire Council

PALLAMALLAWA LEVEE DESIGN REVIEW

WMS partnered with Dryside Engineering to deliver the Pallamallawa Northern Levee Second Design Review
VIC Department of Environment, Land, Water and Planning (DELWP)

Lower Barwon River and Lower Moorabool River Flood Risk Management Study Review