Koumala Flood Study | WMS Engineering
Koumala QLD, Australia

Koumala Flood Study

Questions? Get in touch today.

Client

Queensland Rail

Scope

Impact

Questions? Get in touch today.

Client

Queensland Rail

Scope

Impact

Related Projects

Toowoomba Regional Council

Maclagan and Quinalow Floodplain Risk Management Study and Plan

Toowoomba Regional Council

Crows Nest Floodplain Risk Management Study and Plan

Millmerran flood map
Toowoomba Regional Council

Millmerran Urban Stormwater Master Plan

The aim of this project was also to investigate and address local stormwater quality conditions and future requirements relating to Water Sensitive Urban Design (WSUD).
Toowoomba Regional Council

Jondaryan Floodplain Risk Management Study and Plan

City of Gold Coast

Tallebudgera Creek Hydraulic Model Peer Review

Tenterfield
Tenterfield Shire Council

Tenterfield Dam Bathymetric Survey

WMS conducted a highly accurate bathymetric survey using a Sontek M9 ADCP to accurately determine the volume of water remaining in the dam and the volume of sediment.
Shoalhaven City Council

Millards Creek Flood Study