Kangaroo Flat and Golden Square Flood Mitigation Study
A wonderful collaboration between government bodies, experts and the community that delivered effective solutions to mitigate future flood events.
Toowoomba Regional Council
Millmerran Urban Stormwater Master Plan
The aim of this project was also to investigate and address local stormwater quality conditions and future requirements relating to Water Sensitive Urban Design (WSUD).
Toowoomba Regional Council
Stormwater Catchment Modelling, Planning and Design for Gatton
WMS, in conjunction with RMA Engineers, were commissioned to undertake stormwater catchment modelling, planning and design for the township of Gatton.
Fiji Roads Authority (FRA)
Hydraulic Design of Viti Levu Bridges
Working with Entec, WMS undertook the hydrologic and hydraulic analyses and scour assessments to inform detailed design of four bridges on the island of Viti Levu.